Selected railway & transportation projects.

RAILWAY VIBRATION / GROUND-BORNE NOISE

Selected railway and subway projects involving ground-borne vibration and noise assessment, modelling and mitigation design.

PROJECT REGISTER36 PROJECTS
01Design Works for the Construction of Tunnel Superstructure between Nizami and Cabbarlı StationsBakuAzerbaijanYüksel ProjeGround-borne vibration and noise analysis; risk assessment20262026
PROJECT 01

Design Works for the Construction of Tunnel Superstructure between Nizami and Cabbarlı Stations

LOCATION

Baku, Azerbaijan

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

0.2 km

PROJECT YEAR

2026

MAIN CONTRACTOR

- -

PROJECT DETAILS

The Nizami–Cabbarlı connecting tunnel is part of the planned separation of Baku Metro’s Red and Green lines, intended to improve operational flexibility. The work involves an older-generation tunnel structure with ribbed orthogonal steel framing and a concrete invert.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis associated with the connecting tunnel and railway superstructure.
  • Modelling of the ribbed orthogonal steel tunnel structure, concrete invert and embedded traverse-on-slab track arrangement.
  • Track structure redesign, replacing the original traverse-on-slab track with a plinth-slab track arrangement.
  • Comparative analysis of the original and redesigned track–tunnel models, including insertion-loss evaluation.
  • Statistical uncertainty analysis considering variability in wood and steel material properties.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
02Design Works for the Construction of Tunnels and Stations for Y14 - Y17 Stations on the Green LineBakuAzerbaijanYüksel ProjeGround-borne vibration and noise analysis; risk assessment20252026
PROJECT 02

Design Works for the Construction of Tunnels and Stations for Y14 - Y17 Stations on the Green Line

LOCATION

Baku, Azerbaijan

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

7.0 km

PROJECT YEAR

2025 – 2026

MAIN CONTRACTOR

- -

PROJECT DETAILS

The Green Line development introduces new underground stations along Baku’s eastern growth corridor, including Ağ Şəhər (White City) and neighbouring districts. It supports sustainable public transport in expanding and redeveloping parts of the city.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
03Design Works for the Construction of Tunnels and Stations for B05 - B08 Stations on the Purple LineBakuAzerbaijanYüksel ProjeGround-borne vibration and noise analysis; risk assessment20252026
PROJECT 03

Design Works for the Construction of Tunnels and Stations for B05 - B08 Stations on the Purple Line

LOCATION

Baku, Azerbaijan

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

8.2 km

PROJECT YEAR

2025 – 2026

MAIN CONTRACTOR

- -

PROJECT DETAILS

The Purple Line extension expands Baku’s independent metro corridors and improves links between residential, commercial and developing urban areas. New underground stations and connecting tunnels are planned to improve network capacity and interchange opportunities.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
04Construction of the Mersin-Adana-Osmaniye-Gaziantep High-Standard Railway Line and Supply of Electromechanical SystemsMersin / GaziantepTurkeyRönesans ConstructionSupervision and Quality Assurance Services for Environmental Noise and Vibration Analysis and Assessment20252026
PROJECT 04

Construction of the Mersin-Adana-Osmaniye-Gaziantep High-Standard Railway Line and Supply of Electromechanical Systems

LOCATION

Mersin / Gaziantep, Turkey

DESIGN CONTRACTOR

Rönesans Construction

TRACK LENGTH

286.0 km

PROJECT YEAR

2025 – 2026

MAIN CONTRACTOR

Rönesans Construction

PROJECT DETAILS

The Mersin–Adana–Osmaniye–Gaziantep railway is a major passenger and freight investment connecting four cities in southern Türkiye. The upgraded electrified route is intended to improve regional connectivity, shorten journeys and reinforce links between industry, logistics facilities and Mediterranean ports.

ENKI ENGINEERING — SCOPE OF WORK
  • Technical supervision of the environmental noise and vibration analysis undertaken for the railway project.
  • Quality assurance of environmental noise and vibration assessments prepared within the wider engineering and environmental study programme.
  • Technical review of the assessment work to support the reliability and consistency of project-level noise and vibration evaluations.
05M2 Çayyolu - M3 Sincan Connection Line and Detailed Design ServiesAnkaraTurkeyProta EngineeringGround-borne vibration and noise analysis; risk assessment20252025
PROJECT 05

M2 Çayyolu - M3 Sincan Connection Line and Detailed Design Servies

LOCATION

Ankara, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

12.5 km

PROJECT YEAR

2025

MAIN CONTRACTOR

Prota Engineering

PROJECT DETAILS

The proposed M6 connection links Ankara’s M2 Çayyolu and M3 Sincan metro corridors, establishing a new orbital connection across the western part of the city.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
06Karaman - Ulukışla High-Speed Railway LineKaraman / UlukışlaTurkeyDemce - İntekar Joint VentureGround-borne Vibration Analysis during Construction20242024
PROJECT 06

Karaman - Ulukışla High-Speed Railway Line

LOCATION

Karaman / Ulukışla, Turkey

DESIGN CONTRACTOR

Demce - İntekar Joint Venture

TRACK LENGTH

135.0 km

PROJECT YEAR

2024

MAIN CONTRACTOR

Demce - İntekar Joint Venture

PROJECT DETAILS

The Karaman–Ulukışla project forms part of the high-standard railway corridor connecting Central Anatolia with southern Türkiye.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed surface railway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
07M4 Şehitler - Forum Rail System Extension LineAnkaraTurkeyARUPSupervision and Quality Assurance Services for Environmental Noise and Vibration Analysis and Assessment20242024
PROJECT 07

M4 Şehitler - Forum Rail System Extension Line

LOCATION

Ankara, Turkey

DESIGN CONTRACTOR

ARUP

TRACK LENGTH

6.6 km main line; 1.1 km depot connection

PROJECT YEAR

2024

MAIN CONTRACTOR

TÜMAŞ

PROJECT DETAILS

The M4 extension continues Ankara’s metro beyond Şehitler toward the Forum area, serving Sanatoryum, Ufuktepe and Ovacık. It is intended to improve rapid-transit access in Ankara’s northern districts.

ENKI ENGINEERING — SCOPE OF WORK
  • Technical supervision of the environmental noise and vibration analysis and assessment programme.
  • Quality assurance of the environmental noise and vibration studies supporting the metro extension design.
  • Review of assessment outputs within ENKI’s appointed technical supervision and quality-assurance responsibilities.
08M2 Koru - Yaşamkent and Koru - Bağlıca Rail System Extension LinesAnkaraTurkeyARUPSupervision and Quality Assurance Services for Environmental Noise and Vibration Analysis and Assessment20242024
PROJECT 08

M2 Koru - Yaşamkent and Koru - Bağlıca Rail System Extension Lines

LOCATION

Ankara, Turkey

DESIGN CONTRACTOR

ARUP

TRACK LENGTH

9.4 km

PROJECT YEAR

2024

MAIN CONTRACTOR

TÜMAŞ

PROJECT DETAILS

The planned M2 extensions connect Koru with the developing Yaşamkent and Bağlıca districts. They are intended to improve public transport access to western residential areas and the Başkent University district.

ENKI ENGINEERING — SCOPE OF WORK
  • Technical supervision of the environmental noise and vibration assessments for the proposed railway extensions.
  • Quality assurance of the assessment studies supporting the environmental and engineering design process.
  • Review of the noise and vibration assessment deliverables within the assigned supervision scope.
09M5 Kızılay - Dikmen Rail System Line and Kuğulu Park - Atakule - Turan Güneş Funicular LineAnkaraTurkeyTÜMAŞSupervision and Quality Assurance Services for Environmental Noise and Vibration Analysis and Assessment20242024
PROJECT 09

M5 Kızılay - Dikmen Rail System Line and Kuğulu Park - Atakule - Turan Güneş Funicular Line

LOCATION

Ankara, Turkey

DESIGN CONTRACTOR

TÜMAŞ

TRACK LENGTH

13.0 km metro line; 3.0 km funicular line

PROJECT YEAR

2024

MAIN CONTRACTOR

TÜMAŞ

PROJECT DETAILS

The Kızılay–Dikmen metro project proposes a direct rapid-transit link between central Ankara and southern residential districts along the Dikmen corridor. The original project programme also includes a funicular between Kuğulu Park, Atakule and Turan Güneş Boulevard.

ENKI ENGINEERING — SCOPE OF WORK
  • Technical supervision of environmental noise and vibration assessments associated with the proposed transport system.
  • Quality assurance of the noise and vibration analysis undertaken during the engineering design process.
  • Review of the environmental noise and vibration assessment outputs for the planned railway components.
10Bandırma - Bursa - Yenişehir - Osmaneli Railway LineBursaTurkeyYüksel ProjeSupervision and Quality Assurance Services for Environmental Noise and Vibration Analysis and Assessment20242024
PROJECT 10

Bandırma - Bursa - Yenişehir - Osmaneli Railway Line

LOCATION

Bursa, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

188.0 km

PROJECT YEAR

2024

MAIN CONTRACTOR

Kalyon Construction

PROJECT DETAILS

The Bandırma–Bursa–Yenişehir–Osmaneli railway is planned to connect Bursa to Türkiye’s high-speed railway network at Osmaneli and extend rail access westward toward Bandırma.

ENKI ENGINEERING — SCOPE OF WORK
  • Technical supervision of environmental noise and vibration analysis and assessment activities.
  • Quality assurance of the environmental noise and vibration studies developed for the railway project.
  • Technical review of assessment outputs supporting environmental performance evaluation within the project.
11Pendik - Kartal - Fevzi Çakmak Metro LineIstanbulTurkeyProta EngineeringGround-borne vibration and noise analysis; risk assessment20232023
PROJECT 11

Pendik - Kartal - Fevzi Çakmak Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

5.1 km

PROJECT YEAR

2023

MAIN CONTRACTOR

Özgün COnstruction

PROJECT DETAILS

The Pendik–Kartal–Fevzi Çakmak project strengthens rail connections in eastern Istanbul by linking the Pendik interchange with Kaynarca and the Sabiha Gökçen Airport metro corridor. It also improves integration between metro services, Marmaray and high-speed rail.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
12Bursa Emek - Otogar LineBursaTurkeyProta EngineeringGround-borne vibration and noise analysis; risk assessment20232023
PROJECT 12

Bursa Emek - Otogar Line

LOCATION

Bursa, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

4.9 km

PROJECT YEAR

2023

MAIN CONTRACTOR

ALTAŞ ALTYAPI

PROJECT DETAILS

The Bursa Emek–Otogar line is intended to extend urban rail access toward Bursa’s intercity bus terminal, enabling more convenient transfers between rail services and the city’s wider public transport network.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed railway alignment.
  • Ground-borne noise assessment addressing potential railway-induced impacts along the corridor.
  • Risk assessment of vibration and noise effects associated with the proposed rail infrastructure.
13Cluj Metro LineCluj - NapocaRomaniaGülermak - Arcada - Alstom JVGround-borne vibration analysis and risk assessment; tender-stage pilot study20222022
PROJECT 13

Cluj Metro Line

LOCATION

Cluj - Napoca, Romania

DESIGN CONTRACTOR

Gülermak - Arcada - Alstom JV

TRACK LENGTH

21.0 km

PROJECT YEAR

2022

MAIN CONTRACTOR

Gülermak - Arcada - Alstom JV

PROJECT DETAILS

Cluj Metro is a major metropolitan transport investment intended to connect Florești and Cluj-Napoca along the principal east–west travel corridor.

ENKI ENGINEERING — SCOPE OF WORK
  • Tender-stage pilot study addressing ground-borne vibration associated with the proposed metro system.
  • Preliminary vibration analysis to inform the assessment of railway-induced environmental impacts.
  • Ground-borne vibration risk assessment undertaken in support of the tender-stage engineering evaluation.
  • Assessment of alternative track superstructure configurations to reduce ground-borne vibration transmission.
14Sefaköy - Beylikdüzü Metro LineIstanbulTurkeyYüksel ProjeGround-borne vibration analysis and risk assessment; tender-stage pilot study20222022
PROJECT 14

Sefaköy - Beylikdüzü Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

18.5 km

PROJECT YEAR

2022

MAIN CONTRACTOR

Yüksel Proje

PROJECT DETAILS

The Sefaköy–Beylikdüzü Metro is planned as a significant public transport corridor serving western Istanbul. It is intended to improve travel along the metropolitan westward development axis and provide an alternative to road transport.

ENKI ENGINEERING — SCOPE OF WORK
  • Tender-stage pilot study of ground-borne vibration effects associated with the proposed metro alignment.
  • Preliminary ground-borne vibration analysis for the selected study conditions.
  • Risk assessment addressing the potential for railway-induced vibration impacts.
15Gebze - Darıca Metro LineKocaeliTurkeyProta EngineeringGround-borne vibration and noise analysis; risk assessment20222023
PROJECT 15

Gebze - Darıca Metro Line

LOCATION

Kocaeli, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

15.4 km

PROJECT YEAR

2022 – 2023

MAIN CONTRACTOR

Meting-Met-Gün-Eze-Gökçe JV

PROJECT DETAILS

The Gebze–Darıca Metro connects Darıca’s coastal districts with Gebze’s industrial zones and major residential areas.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
16Dikimevi - NATO Yolu Ankaray ExtensionAnkaraTurkeyYüksel ProjeGround-borne vibration analysis and risk assessment; 7.5 km railway corridor20212022
PROJECT 16

Dikimevi - NATO Yolu Ankaray Extension

LOCATION

Ankara, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

7.5 km

PROJECT YEAR

2021 – 2022

MAIN CONTRACTOR

Gülermak Construction

PROJECT DETAILS

The Dikimevi–NATO Yolu extension carries Ankara’s Ankaray light metro eastward through established districts, including Abidinpaşa, Tuzluçayır and Natoyolu. It is designed to offer more direct access between eastern Ankara and the city centre.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
17Dudullu - Bostancı Metro LineIstanbulTurkeyEMAY International Engineering & Cons.Ground-borne vibration analysis and risk assessment; 10 km railway corridor20212022
PROJECT 17

Dudullu - Bostancı Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

EMAY International Engineering & Cons.

TRACK LENGTH

10.0 km

PROJECT YEAR

2021 – 2022

MAIN CONTRACTOR

Şenbay-Kolin-Kalyon JV

PROJECT DETAILS

The Dudullu–Bostancı Metro, part of Istanbul’s M8 corridor, provides a north–south rapid-transit connection across the Anatolian side. It links residential, commercial and industrial districts with east–west transport corridors, including Marmaray and other metro lines.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
18GAZİRAYGaziantepTurkeyKalyon -ASL ConstructionGround-borne vibration analysis and risk assessment; 5.5 km railway corridor20202021
PROJECT 18

GAZİRAY

LOCATION

Gaziantep, Turkey

DESIGN CONTRACTOR

Kalyon -ASL Construction

TRACK LENGTH

5.5 km

PROJECT YEAR

2020 – 2021

MAIN CONTRACTOR

Kalyon -ASL Construction

PROJECT DETAILS

GAZİRAY links central Gaziantep with major industrial and employment areas. The suburban railway serves organised industrial zones and urban districts through surface tracks, underground crossings and interchange facilities.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Ground-borne vibration analysis for the proposed surface railway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
19Kadıköy - Sultanbeyli Rapid Metro LineIstanbulTurkeyProta EngineeringGround-borne vibration and noise analysis; risk assessment20192021
PROJECT 19

Kadıköy - Sultanbeyli Rapid Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

18.4 km

PROJECT YEAR

2019 – 2021

MAIN CONTRACTOR

Prota Engineering

PROJECT DETAILS

The Kadıköy–Sultanbeyli corridor is intended to extend rapid-transit access from Istanbul’s established western Anatolian-side network toward growing residential districts farther east. It forms part of the city’s long-term rail-network development and seeks to reduce dependence on road transport.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
20Halkalı - Istanbul Airport Rapid Metro LineIstanbulTurkeyYüksel ProjeGround-borne vibration and noise analysis; risk assessment20192020
PROJECT 20

Halkalı - Istanbul Airport Rapid Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

31.5 km

PROJECT YEAR

2019 – 2020

MAIN CONTRACTOR

Cengiz-Kolin-Kalyon-Özgün Tapı JV

PROJECT DETAILS

The Halkalı–Istanbul Airport rapid metro forms part of the high-capacity rail access network serving Istanbul Airport. The corridor is intended to connect airport services with Halkalı and other urban interchanges, supporting integration with the metropolitan railway network.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
21Kirazlı - Bakırköy IDO Metro LineIstanbulTurkeyProta EngineeringGround-borne vibration analysis and risk assessment; 8.8 km railway corridor20182020
PROJECT 21

Kirazlı - Bakırköy IDO Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

8.8 km

PROJECT YEAR

2018 – 2020

MAIN CONTRACTOR

AGA Enerji

PROJECT DETAILS

The Kirazlı–Bakırköy İDO Metro links western Istanbul’s inland metro network to Bakırköy’s coastal district and major interchanges. As part of the M3 operating corridor, it improves access to residential areas, commercial centres, hospitals and transport connections near the Marmara coast.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
22Ataköy - İkitelli Metro LineIstanbulTurkeyProta EngineeringGround-borne vibration analysis and risk assessment; 13.4 km railway corridor20182020
PROJECT 22

Ataköy - İkitelli Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

13.4 km

PROJECT YEAR

2018 – 2020

MAIN CONTRACTOR

AGA Enerji

PROJECT DETAILS

The Ataköy–İkitelli Metro, part of Istanbul’s M9 corridor, provides a north–south link between Ataköy and the industrial and residential districts of İkitelli and Başakşehir. Interchange with Marmaray, Metrobus and east–west metro routes strengthens connectivity across western Istanbul.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
23Kabataş - Mecidiyeköy - Mahmutbey Metro LineIstanbulTurkeyProta EngineeringGround-borne vibration analysis and risk assessment; 23 km railway corridor20162018
PROJECT 23

Kabataş - Mecidiyeköy - Mahmutbey Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

23.0 km

PROJECT YEAR

2016 – 2018

MAIN CONTRACTOR

Kolin-Kalyon-Gülermak JV

PROJECT DETAILS

The Kabataş–Mecidiyeköy–Mahmutbey Metro is a major cross-city rapid-transit corridor connecting densely developed central Istanbul with western residential and commercial districts. The line incorporates fully automated operation and interchange connections to other public transport routes.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne noise and vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
24Kaynarca - Sabiha Gökçen Airport Metro LineIstanbulTurkeyYüksel ProjeGround-borne vibration analysis and risk assessment; 7.4 km railway corridor20162017
PROJECT 24

Kaynarca - Sabiha Gökçen Airport Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

7.4 km

PROJECT YEAR

2016 – 2017

MAIN CONTRACTOR

Gülermak-YSE JV

PROJECT DETAILS

The Kaynarca–Sabiha Gökçen Airport Metro provides a strategic rail link between Istanbul’s Anatolian-side metro network and Sabiha Gökçen International Airport. It supports airport access through integrated rapid transit.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
25Antalya Tram Line No. 3AntalyaTurkeyYüksel ProjeAssessment of Tram-induced Ground-borne Vibration on Historic Structures20162016
PROJECT 25

Antalya Tram Line No. 3

LOCATION

Antalya, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

26.5 km main line; 3.4 km connections

PROJECT YEAR

2016

MAIN CONTRACTOR

Yüksel Proje

PROJECT DETAILS

Antalya’s third-stage tram line extends the city’s rail network, improving connections between Varsak, the intercity bus terminal, university areas, hospitals and other destinations.

ENKI ENGINEERING — SCOPE OF WORK
  • Assessment of tram-induced ground-borne vibration effects on historic structures.
  • Evaluation of potential vibration-related risks to the sensitive historic buildings and structures considered within the study.
  • Technical assessment of railway-induced vibration in the context of historic-structure protection.
26Antalya Tram Line No. 2AntalyaTurkeyYüksel ProjeAssessment of Tram-induced Ground-borne Vibration on Historic Düden Bridge20162016
PROJECT 26

Antalya Tram Line No. 2

LOCATION

Antalya, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

19.1 km main line; 1.4 km depot connection

PROJECT YEAR

2016

MAIN CONTRACTOR

Yüksel Proje

PROJECT DETAILS

Antalya’s second-stage tram line extends urban rail services toward Antalya Airport and the EXPO 2016 area, improving access between the city centre, the airport and eastern development districts.

ENKI ENGINEERING — SCOPE OF WORK
  • Assessment of tram-induced ground-borne vibration effects on the historic Düden Bridge.
  • Evaluation of the bridge’s potential exposure to railway-induced vibration.
  • Vibration risk assessment focused on the historic bridge structure and its sensitivity to tramway operation.
27Ankara High-Speed Railway Station Shopping Centre & HotelAnkaraTurkeyA ArchitectureGround-borne vibration isolation and acoustic design20132015
PROJECT 27

Ankara High-Speed Railway Station Shopping Centre & Hotel

LOCATION

Ankara, Turkey

DESIGN CONTRACTOR

A Architecture

TRACK LENGTH

N/A

PROJECT YEAR

2013 – 2015

MAIN CONTRACTOR

Limak-Kolin-Cengiz JV

PROJECT DETAILS

The Ankara High-Speed Railway Station complex combines passenger rail facilities with commercial spaces, offices, a hotel and other mixed-use functions. Its proximity to high-speed rail operations makes acoustic performance and vibration isolation important to the occupied building areas.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration isolation engineering for the shopping centre and hotel development.
  • Acoustic design services for the building complex.
  • Engineering assessment of vibration isolation requirements in the context of railway-adjacent mixed-use occupancy.
28Kartal - Kaynarca Metro LineIstanbulTurkeyYüksel ProjeGround-borne vibration analysis and risk assessment; 5 km railway corridor20132014
PROJECT 28

Kartal - Kaynarca Metro Line

LOCATION

Istanbul, Turkey

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

5.0 km

PROJECT YEAR

2013 – 2014

MAIN CONTRACTOR

Şenbay-Öztaş-Albayrak JV

PROJECT DETAILS

The Kartal–Kaynarca Metro extension expands Istanbul’s M4 corridor eastward from Kartal toward Pendik and Kaynarca. It improves access to developing residential and commercial districts and supports the continued expansion of the Anatolian-side rail network.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
29Eskişehir High-Speed Railway Station CrossingEskişehirTurkeyGülermak ConstructionGround-borne vibration analysis and risk assessment; 1.5 km railway corridor20132013
PROJECT 29

Eskişehir High-Speed Railway Station Crossing

LOCATION

Eskişehir, Turkey

DESIGN CONTRACTOR

Gülermak Construction

TRACK LENGTH

1.5 km

PROJECT YEAR

2013

MAIN CONTRACTOR

Gülermak Construction

PROJECT DETAILS

The Eskişehir High-Speed Railway Station Crossing forms part of the reorganisation of railway infrastructure through the city centre. The project is intended to reduce the physical barrier created by the railway and improve connections between surrounding urban areas.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the 1.5 km railway crossing section.
  • Assessment of the potential vibration effects of high-speed railway operation on surrounding urban development.
  • Ground-borne vibration risk assessment associated with the railway crossing infrastructure.
30Levent–Hisarüstü Metro LineIstanbulTürkiyeYüksel ProjeGround-borne vibration analysis and risk assessment 3.5 km railway corridor20132013
PROJECT 30

Levent–Hisarüstü Metro Line

LOCATION

Istanbul, Türkiye

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

3.5 km

PROJECT YEAR

2013

MAIN CONTRACTOR

Alarko-Makyol JV

PROJECT DETAILS

The Levent–Hisarüstü Metro connects Istanbul’s M2 corridor with Etiler, Boğaziçi University and Hisarüstü. It improves public transport access to educational and residential destinations.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
31Marmaray Gebze–Pendik SectionIstanbul / KocaeliTürkiyeProta EngineeringGround-borne vibration analysis and risk assessment 52 km railway corridor20122013
PROJECT 31

Marmaray Gebze–Pendik Section

LOCATION

Istanbul / Kocaeli, Türkiye

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

52.0 km

PROJECT YEAR

2012 – 2013

MAIN CONTRACTOR

OHL-CR3

PROJECT DETAILS

The Marmaray Gebze–Pendik section is part of Istanbul’s integrated suburban and intercity rail network. Railway modernisation supports continuous suburban services and improved links with high-speed trains and the transcontinental Marmaray corridor.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
32Üsküdar–Ümraniye–Çekmeköy Metro LineIstanbulTürkiyeProta EngineeringGround-borne vibration analysis and risk assessment 16 km railway corridor20122015
PROJECT 32

Üsküdar–Ümraniye–Çekmeköy Metro Line

LOCATION

Istanbul, Türkiye

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

16.0 km

PROJECT YEAR

2012 – 2015

MAIN CONTRACTOR

Doğuş Construction

PROJECT DETAILS

The Üsküdar–Ümraniye–Çekmeköy Metro forms a major east–west corridor on Istanbul’s Anatolian side, connecting residential areas with transport interchanges and commercial centres. Developed as Türkiye’s first fully automated driverless metro, it offers connections with Marmaray and the wider public transport system.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
33Şişhane–Yenikapı Metro LineIstanbulTürkiyeYüksel ProjeGround-borne vibration analysis and risk assessment 3.5 km railway corridor20122012
PROJECT 33

Şişhane–Yenikapı Metro Line

LOCATION

Istanbul, Türkiye

DESIGN CONTRACTOR

Yüksel Proje

TRACK LENGTH

3.5 km

PROJECT YEAR

2012

MAIN CONTRACTOR

Alsim Alarko

PROJECT DETAILS

The Şişhane–Yenikapı extension connects Istanbul’s M2 Metro with the Yenikapı interchange, providing access to Marmaray and other rail services. It incorporates the Haliç Metro Crossing Bridge through the historic urban centre.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
34Warsaw Metro Line II – Phase IIWarsawPolandProta Engineering, ILFGround-borne vibration analysis and risk assessment 6 km railway corridor20102012
PROJECT 34

Warsaw Metro Line II – Phase II

LOCATION

Warsaw, Poland

DESIGN CONTRACTOR

Prota Engineering, ILF

TRACK LENGTH

6.0 km

PROJECT YEAR

2010 – 2012

MAIN CONTRACTOR

Astaldi-Gülermak-PBDIM JV

PROJECT DETAILS

Warsaw Metro Line II establishes a major east–west rapid-transit corridor, including a tunnel beneath the Vistula River. The line connects residential, commercial and administrative districts across both riverbanks.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
35İzmir Metro – Phase IIİzmirTürkiyeÖztaş ConstructionGround-borne vibration analysis and risk assessment 5.2 km railway corridor20092010
PROJECT 35

İzmir Metro – Phase II

LOCATION

İzmir, Türkiye

DESIGN CONTRACTOR

Öztaş Construction

TRACK LENGTH

5.2 km

PROJECT YEAR

2009 – 2010

MAIN CONTRACTOR

TEKFEN

PROJECT DETAILS

The second phase of İzmir Metro expands the original system toward the Üçyol–Üçkuyular corridor, serving established residential and commercial districts. It improves transport access along the southern urban corridor.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.
36Kadıköy–Kartal Metro LineIstanbulTürkiyeProta EngineeringGround-borne vibration analysis and risk assessment 25 km railway corridor20082011
PROJECT 36

Kadıköy–Kartal Metro Line

LOCATION

Istanbul, Türkiye

DESIGN CONTRACTOR

Prota Engineering

TRACK LENGTH

25.0 km

PROJECT YEAR

2008 – 2011

MAIN CONTRACTOR

Astaldi-Makyol-Gülermak JV

PROJECT DETAILS

The Kadıköy–Kartal Metro was the first major underground metro corridor on Istanbul’s Anatolian side. Developed along the D100 transport axis, it introduced a high-capacity alternative to road travel through established residential and commercial districts.

ENKI ENGINEERING — SCOPE OF WORK
  • Ground-borne vibration analysis for the proposed subway infrastructure.
  • Risk assessment associated with railway-induced vibration and ground-borne noise along the alignment.